Worked on the WSG report. Received the paperwork from Lt. Col. Brown at Fort Leavenworth; the cy. of FM 101-31 Chg 1 was sent through CONARC, so it will be another week or so before it gets here.
Sat in a group mtg. to talk about what to do for Darnell; JFN put an outline on the board of his contemplated next move; it stresses technical integration. Most of the group are vaguely aware of the existence of functional integration, but are not prepared to become aware of its implications. Proposal is to set up a pair of centers at AEPG.
Evening – Received all but one of the documents from Ft. Leavenworth and the one is that really needed FM 101-31 Chg 1; it was forwarded thru CONARC.
Clear – 25˚
Windy
Bent the tail pipe on the hard snow at the street — in backing out of our driveway.