Tuesday, 16 October, 1962

Listed two, or transferred two Secret Sperry reports to Aubyn, plus 3 unclassified ones, also from Sperry.

Gave Pike Hugh Miser’s name and that of Project OMEGA in DCA re: his problem of OA on the basic problem of an ICBM strike on us.

Warmer
RH 74%

Went home about 3:30 PM; the load of soil came as we were going down to AMS after the Ford. The front brake cylinders were only half-operative. The auto choke was lubricated, as was the parking brake cable at the rear drum entrance.

Poured the rest of the concrete curbing.

Rec’d BB&N’s report. They recommend that the ceiling have a hard surface, two single channel systems, EV LR4’s line source speakers if we use them, and a realignment of Lake’s proposal. I’ll plan to read it Friday night.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.