Started to organize material again to straighten out the test planning details.
WZL called Bino & I in to tell us that the angular acceleration and range rates are needed by 01 May. He gave me the draft test program document from Geo Elliott. Bino needs the 4th Stage characteristics in order to put thrust into the Petersen program.
Called Lou Kraff at L2/LA re; the 7 questions of yesterday. He spoke with Walt Wells this morning (PST) to the effect that why do we need them, etc.
Can’t find Kent Kresa or John Jelatis.
Went to Boyers on the way to work to get a universal joint kit, but he didn’t have one, so I called AMS & told them to go ahead on their source.
Regulated the piano let-off and back-checks. I didn’t leave them in one line; perhaps this is due to poor key leveling.