Thursday, 31 May, 1962

Had some discussion with JLV. He leaves Sunday to take over the office at BSD. He said he was going to try to tie together the loose ends of L2 connection with BSD. I lent him my copy of the Rand paper on the Conceptual Map.

Started to work on an STV Program Map. It looks now as if an extension of the table on p. 11 of the Aerospace document PA 939 would be useful.

Sticky

Had sand, gravel, & cement delivered. Stopped at Leo’s to arrange for reinforcing steel; I’ll pick it up tomorrow.

Picked up expansion joint material at Ideal in Waltham; they want $23/100 for 8″x 8″x 16″ concrete lock delivered compared to $27/100 at the Acton Block Company on Rt. 27.

Hard rainstorm about 8 PM.

Had the blue Willys brought home from AMS; this trip cost $5.